Safe, certified installation and commissioning of your Riello UPS — from a single tower to a parallel multi-cabinet system.
A UPS is only as reliable as its installation. Our engineers handle delivery, positioning, cabling, earthing, battery commissioning and full load testing. We work around your operations to minimise downtime and leave you with a commissioned, documented and handed-over system.
Heavy-lift delivery and placement in your plant room or comms cabinet.
Input, output, bypass and battery cabling installed and terminated to standard.
Correct earthing and neutral bonding for safety and signal integrity.
VRLA, Li-ion or supercap strings connected, tested and logged.
Full load and bypass testing before we hand over.
Test results, commissioning certificate and handover documentation.
We confirm access, routes, floor loading and isolation points.
A method statement and programme that works around your uptime.
Our engineers install, connect, test and commission to the design.
We walk your team through operation, alarms and basic maintenance.
Get a fixed-price installation and commissioning quotation.